Monday, 17 July 2017

MEP BIM Modeling and Clash Detection for Plant Room of College Campus Building Based in Europe



The Objective
The Team Created 3D architecture and structure layout in Revit MEP and allocate mechanical equipment with connection for a clash free model.Technology/Software Used
Revit
Challenges
  • A detailed plant room with all the spatial information, equipment and connections had to be developed from general arrangement drawings and a set of pdf files with manufacturing details of the MEP equipment.
  • The process henceforth involved clash detection, reporting, and resolutions. Finally, clash free models, rendered images and shop drawings had to be delivered in a time span of 3 Months.
Engineering Solution
  • MEP designs and general arrangement drawings were thoroughly examined
  • Basic 3D architecture and structure layout was created in Revit MEP
  • Mechanical equipment with detailed connections and well-arranged clash free model as per provided inputs was prepared
  • In addition to Revit MEP Plant rooms and shop drawings, sheet setup and 3D rendering as required was also developed and handed over to client
Benefits

  • The project was successfully executed and handed over within the specified time frame of 3 months.
  • Initially, the contract was on the project basis. As client was satisfied with the quality produced, he has opted for the full-time resource business model, and a long term partnership was built.

No comments:

Post a Comment